Charts reference

Common Fresh & Hardened Concrete Test Methods

A field-oriented map of common ASTM concrete tests and what each measurement tells you.

Editorial review: 2026-09-29 · How we review technical content

Key takeaways

  • This table is a navigation aid to the purpose of common test methods; it does not reproduce their procedures. Current ASTM editions should be checked before formal testing.
  • A test number without proper sampling, equipment, timing, specimen handling, and documentation can be misleading. Project specifications determine which tests and frequencies are required.
Test/measurementCommon ASTM designationWhat it indicates
Sampling fresh concreteC172/C172MHow the composite sample is obtained
TemperatureC1064/C1064MFresh concrete temperature
SlumpC143/C143MConsistency/workability indicator
Unit weight / yieldC138/C138MDensity, yield, gravimetric air calculation
Air — pressure methodC231/C231MAir content for applicable concrete
Air — volumetric methodC173/C173MAir content by volumetric method
Making/curing field specimensC31/C31MSpecimen molding and field curing
Compressive strengthC39/C39MCylinder compressive strength

How to read this table

This table is a navigation aid to the purpose of common test methods; it does not reproduce their procedures. Current ASTM editions should be checked before formal testing.

Where it is useful

Use it when building a testing plan, checking whether the right fresh-concrete tests are being performed, or understanding what a test report actually represents.

Limitations

A test number without proper sampling, equipment, timing, specimen handling, and documentation can be misleading. Project specifications determine which tests and frequencies are required.

How to apply this reference

Match each property to the correct current ASTM method and trained technician.

A test number is only as reliable as sampling, equipment, procedure, specimen handling and traceable documentation.

References & further reading